Additions & Structural
Basement Finishing
Unfinished basements framed, insulated, and finished into livable space, with moisture control handled first.
From $22,000
Typical timeline: 4 to 6 weeks
- Moisture and drainage assessed before framing starts
- Egress window installation where required by code
- Framing, electrical, and drywall handled in-house
- Flooring options rated for below-grade installation
A finished basement is only as good as the moisture control underneath it. We assess drainage and vapor barriers before any framing goes in, so the room stays dry and the drywall stays intact.
How it works
From the first sketch to the final walkthrough
Free consultation
Walk us through the project and we will scope it on-site, often within the week.
Fixed-price proposal
A written, itemized proposal before any demo starts, so there are no surprises mid-project.
The build, managed for you
One project manager and an in-house crew handle every trade, with a written schedule and weekly updates.
Walkthrough, not a hand-wave
Every project ends with a room-by-room walkthrough and a 5-year workmanship warranty.
More in Additions & Structural
Related services
Not sure where to start
Describe the project, we will scope it with you
A short call is usually enough to tell you what it takes, in scope and in budget, before you commit to anything.
- Fixed-price proposals agreed before demo day
- In-house crews for every trade
- 5-year workmanship warranty