Every service, one page

Kitchen, bathroom, and whole-home renovation services

Filter by category, or browse everything we build. Every project includes a fixed-price proposal before work begins.

24 services available

Renovated kitchen with an island and pendant lighting
  • Kitchen
  • Remodel

Kitchen Remodeling

Full kitchen renovations, from a new layout and cabinetry to countertops, lighting, and appliances, managed by one crew start to finish.

From $28,000 Typical timeline: 5 to 8 weeks
Custom kitchen cabinetry with waterfall stone countertop island
  • Kitchen
  • Cabinetry

Custom Cabinetry & Countertops

Custom-built cabinetry and stone or quartz countertops, measured, built, and installed by our own finish carpenters.

From $9,500 Typical timeline: 2 to 4 weeks
Kitchen island with waterfall countertop and bar seating
  • Kitchen
  • Cabinetry

Kitchen Island Installation

A new kitchen island added to an existing layout, with seating, storage, or a second sink and cooktop built in.

From $6,500 Typical timeline: 1 to 2 weeks
Kitchen with mosaic tile backsplash behind the cooktop
  • Kitchen
  • Interior

Backsplash & Tile Installation

Tile backsplash installed behind counters and cooktops, from subway tile to full slab stone.

From $1,800 Typical timeline: 2 to 4 days
Kitchen island with two pendant lights over the counter
  • Kitchen
  • Electrical

Kitchen Lighting & Electrical Upgrades

Pendant lighting, under-cabinet lighting, and outlet or circuit upgrades for kitchens that need more than one overhead fixture.

From $1,200 Typical timeline: 1 to 3 days
Organized walk in pantry with custom shelving
  • Kitchen
  • Cabinetry

Pantry & Butler's Pantry Build-Out

A walk-in pantry or butler's pantry built into unused space, with custom shelving sized to how you actually store food.

From $4,500 Typical timeline: 1 to 2 weeks
Renovated bathroom with double vanity and tile shower
  • Bathroom
  • Remodel

Bathroom Remodeling

Full bathroom renovations, including tile, vanity, plumbing fixtures, and layout changes, done in as little as two weeks.

From $14,000 Typical timeline: 2 to 4 weeks
Walk in shower with glass panel and marble tile surround
  • Bathroom
  • Remodel

Walk-In Shower & Tub Conversions

Tub to walk-in shower conversions with a low or zero-threshold pan, done in a matter of days.

From $6,500 Typical timeline: 3 to 5 days
Blue subway tile shower with handheld shower head
  • Bathroom
  • Interior

Tile & Waterproofing

Shower and floor tile installed over a properly waterproofed substrate, the step most callbacks trace back to.

From $2,600 Typical timeline: 3 to 6 days
Small powder room with vanity and framed art
  • Bathroom
  • Additions

Half Bath Addition

A new powder room added to an underused hallway, closet, or corner, plumbed from the nearest existing line.

From $9,500 Typical timeline: 2 to 3 weeks
Accessible bathroom with grab bars and curbless shower
  • Bathroom
  • Remodel

Accessible & Aging-in-Place Modifications

Grab bars, curbless showers, wider doorways, and other modifications that let homeowners stay in their home safely.

From $5,800 Typical timeline: 1 to 2 weeks
Home addition under construction with new framing attached to existing house
  • Additions
  • Structural

Home Additions

Room additions and second-story additions, designed and permitted to match your home's existing structure and style.

Free in-home estimate Typical timeline: 3 to 5 months
Basement space framed for finishing
  • Additions
  • Interior

Basement Finishing

Unfinished basements framed, insulated, and finished into livable space, with moisture control handled first.

From $22,000 Typical timeline: 4 to 6 weeks
Framing crew building a new roof structure
  • Structural

Structural & Framing Work

Load-bearing wall removal, open-concept conversions, and structural framing, engineered and permitted properly.

From $4,500 Scheduled within 1 to 2 weeks
Garage space before conversion into finished living space
  • Additions
  • Interior

Garage Conversion

A garage converted into a bonus room, home gym, or office, insulated and finished to match the rest of the house.

From $18,000 Typical timeline: 4 to 6 weeks
Sunroom addition with glass windows and seating
  • Additions
  • Structural

Sunroom Addition

A three or four season sunroom added off an existing living space, with the framing and glazing sized for your climate.

From $32,000 Typical timeline: 6 to 10 weeks
Aerial view of a new foundation and footings under construction
  • Structural

Foundation & Structural Repair

Foundation crack repair, settling correction, and structural reinforcement for homes with visible movement or water intrusion.

From $6,500 Scheduled within 1 to 2 weeks
Freshly renovated bedroom with designer finishes
  • Interior
  • Remodel

Whole-Home Renovation

Full-house renovations covering every room, coordinated under a single project manager and one fixed-price contract.

From $75,000 Typical timeline: 3 to 6 months
Hardwood flooring being installed
  • Interior
  • Flooring

Flooring Installation

Hardwood, tile, and luxury vinyl plank flooring, installed room by room or throughout the whole home.

From $6 per sq ft installed Typical timeline: 3 to 7 days
Interior wall being painted
  • Interior
  • Painting

Interior Painting & Drywall

Interior painting and drywall repair, from a single room refresh to a full-house repaint after a renovation.

From $3 per sq ft Typical timeline: 2 to 5 days
Newly built wood deck attached to a home
  • Outdoor

Decks & Outdoor Living

Decks, patios, and outdoor kitchens built to extend your living space outside, in wood or low-maintenance composite.

From $8,500 Typical timeline: 1 to 3 weeks
Contractor installing a new exterior window
  • Interior
  • Outdoor

Window & Door Replacement

Energy efficient windows and exterior doors installed in existing openings or resized for a new layout.

From $650 per opening Typical timeline: 1 to 3 days
Crew installing new exterior siding on a house
  • Outdoor
  • Painting

Exterior Siding & Painting

Exterior siding replacement and painting that protects the house and resets its curb appeal in one project.

From $2 per sq ft Typical timeline: 1 to 2 weeks

Design & build packages

Three ways to work with us, one standard of craftsmanship

From a single-room refresh to a full-house renovation, every package includes a dedicated project manager and a fixed-price contract.

Essentials Package

A single-room refresh: paint, fixtures, hardware, and cosmetic updates without moving walls or plumbing.

From $8,500

  • Design consultation included
  • Fixed-price proposal
  • Completed in 1 to 2 weeks
  • 5-year workmanship warranty
Start with Essentials
Most popular

Full Remodel Package

A complete kitchen or bathroom remodel: new layout, cabinetry, fixtures, and finishes, managed start to finish.

From $28,000

  • Free in-home design consultation and 3D layout
  • Fixed-price proposal before demo day
  • In-house crew for every trade
  • Dedicated project manager
  • 5-year workmanship warranty
Start a Full Remodel

Whole-Home Package

Multi-room and whole-house renovations, including structural work, coordinated under a single contract.

From $75,000

  • Full design-build service
  • One project manager for the entire scope
  • Phased scheduling to keep part of the home livable
  • Weekly progress updates and photos
  • Structural engineering included where required
  • 5-year workmanship warranty
Start a Whole-Home Project

Not sure where to start

Describe the project, we will scope it with you

A short call is usually enough to tell you what it takes, in scope and in budget, before you commit to anything.

  • Fixed-price proposals agreed before demo day
  • In-house crews for every trade
  • 5-year workmanship warranty
Contractor reviewing blueprint plans

Ready to start your renovation?

Fixed-price proposals, in-house crews, and a project manager who shows up on schedule.

Get a Free Estimate

Keep scrolling for the full directory