General contractor, in-house crews

Renovations built to last a lifetime, not a listing photo

Kitchens, bathrooms, additions, and whole-home renovations, managed by one crew from the first sketch to the final walkthrough. Fixed-price proposals, no subcontractor gaps.

Licensed, bonded, and insured. Serving homeowners across the metro area.

18+

Years building for local homeowners

600+

Renovations completed

5-year

Workmanship warranty on every project

0

Subcontractor gaps, every trade in-house

What we build

Four ways we take on a renovation

Pick a category to see what is included, or browse every service on one page.

01 / 04

From $28,000

Kitchen Remodeling

New layouts, custom cabinetry, and countertops, designed and built by the same crew from demo to final walkthrough.

  • Free design consultation and 3D layout
  • Fixed-price proposal before demo day
  • In-house cabinetry and countertop install
View kitchen services
Renovated kitchen with an island and pendant lighting

How it works

From the first sketch to the final walkthrough

01

Free consultation

Walk us through the project and we will scope it on-site, often within the week.

02

Fixed-price proposal

A written, itemized proposal before any demo starts, so there are no surprises mid-project.

03

The build, managed for you

One project manager and an in-house crew handle every trade, with a written schedule and weekly updates.

04

Walkthrough, not a hand-wave

Every project ends with a room-by-room walkthrough and a 5-year workmanship warranty.

Services

Every project we take on

Filter by category, or browse everything. Every project includes a fixed-price proposal before work begins.

24 services available

Renovated kitchen with an island and pendant lighting
  • Kitchen
  • Remodel

Kitchen Remodeling

Full kitchen renovations, from a new layout and cabinetry to countertops, lighting, and appliances, managed by one crew start to finish.

From $28,000 Typical timeline: 5 to 8 weeks
Custom kitchen cabinetry with waterfall stone countertop island
  • Kitchen
  • Cabinetry

Custom Cabinetry & Countertops

Custom-built cabinetry and stone or quartz countertops, measured, built, and installed by our own finish carpenters.

From $9,500 Typical timeline: 2 to 4 weeks
Kitchen island with waterfall countertop and bar seating
  • Kitchen
  • Cabinetry

Kitchen Island Installation

A new kitchen island added to an existing layout, with seating, storage, or a second sink and cooktop built in.

From $6,500 Typical timeline: 1 to 2 weeks
Kitchen with mosaic tile backsplash behind the cooktop
  • Kitchen
  • Interior

Backsplash & Tile Installation

Tile backsplash installed behind counters and cooktops, from subway tile to full slab stone.

From $1,800 Typical timeline: 2 to 4 days
Kitchen island with two pendant lights over the counter
  • Kitchen
  • Electrical

Kitchen Lighting & Electrical Upgrades

Pendant lighting, under-cabinet lighting, and outlet or circuit upgrades for kitchens that need more than one overhead fixture.

From $1,200 Typical timeline: 1 to 3 days
Organized walk in pantry with custom shelving
  • Kitchen
  • Cabinetry

Pantry & Butler's Pantry Build-Out

A walk-in pantry or butler's pantry built into unused space, with custom shelving sized to how you actually store food.

From $4,500 Typical timeline: 1 to 2 weeks
Renovated bathroom with double vanity and tile shower
  • Bathroom
  • Remodel

Bathroom Remodeling

Full bathroom renovations, including tile, vanity, plumbing fixtures, and layout changes, done in as little as two weeks.

From $14,000 Typical timeline: 2 to 4 weeks
Walk in shower with glass panel and marble tile surround
  • Bathroom
  • Remodel

Walk-In Shower & Tub Conversions

Tub to walk-in shower conversions with a low or zero-threshold pan, done in a matter of days.

From $6,500 Typical timeline: 3 to 5 days
Blue subway tile shower with handheld shower head
  • Bathroom
  • Interior

Tile & Waterproofing

Shower and floor tile installed over a properly waterproofed substrate, the step most callbacks trace back to.

From $2,600 Typical timeline: 3 to 6 days
Small powder room with vanity and framed art
  • Bathroom
  • Additions

Half Bath Addition

A new powder room added to an underused hallway, closet, or corner, plumbed from the nearest existing line.

From $9,500 Typical timeline: 2 to 3 weeks
Accessible bathroom with grab bars and curbless shower
  • Bathroom
  • Remodel

Accessible & Aging-in-Place Modifications

Grab bars, curbless showers, wider doorways, and other modifications that let homeowners stay in their home safely.

From $5,800 Typical timeline: 1 to 2 weeks
Home addition under construction with new framing attached to existing house
  • Additions
  • Structural

Home Additions

Room additions and second-story additions, designed and permitted to match your home's existing structure and style.

Free in-home estimate Typical timeline: 3 to 5 months
Basement space framed for finishing
  • Additions
  • Interior

Basement Finishing

Unfinished basements framed, insulated, and finished into livable space, with moisture control handled first.

From $22,000 Typical timeline: 4 to 6 weeks
Framing crew building a new roof structure
  • Structural

Structural & Framing Work

Load-bearing wall removal, open-concept conversions, and structural framing, engineered and permitted properly.

From $4,500 Scheduled within 1 to 2 weeks
Garage space before conversion into finished living space
  • Additions
  • Interior

Garage Conversion

A garage converted into a bonus room, home gym, or office, insulated and finished to match the rest of the house.

From $18,000 Typical timeline: 4 to 6 weeks
Sunroom addition with glass windows and seating
  • Additions
  • Structural

Sunroom Addition

A three or four season sunroom added off an existing living space, with the framing and glazing sized for your climate.

From $32,000 Typical timeline: 6 to 10 weeks
Aerial view of a new foundation and footings under construction
  • Structural

Foundation & Structural Repair

Foundation crack repair, settling correction, and structural reinforcement for homes with visible movement or water intrusion.

From $6,500 Scheduled within 1 to 2 weeks
Freshly renovated bedroom with designer finishes
  • Interior
  • Remodel

Whole-Home Renovation

Full-house renovations covering every room, coordinated under a single project manager and one fixed-price contract.

From $75,000 Typical timeline: 3 to 6 months
Hardwood flooring being installed
  • Interior
  • Flooring

Flooring Installation

Hardwood, tile, and luxury vinyl plank flooring, installed room by room or throughout the whole home.

From $6 per sq ft installed Typical timeline: 3 to 7 days
Interior wall being painted
  • Interior
  • Painting

Interior Painting & Drywall

Interior painting and drywall repair, from a single room refresh to a full-house repaint after a renovation.

From $3 per sq ft Typical timeline: 2 to 5 days
Newly built wood deck attached to a home
  • Outdoor

Decks & Outdoor Living

Decks, patios, and outdoor kitchens built to extend your living space outside, in wood or low-maintenance composite.

From $8,500 Typical timeline: 1 to 3 weeks
Contractor installing a new exterior window
  • Interior
  • Outdoor

Window & Door Replacement

Energy efficient windows and exterior doors installed in existing openings or resized for a new layout.

From $650 per opening Typical timeline: 1 to 3 days
Crew installing new exterior siding on a house
  • Outdoor
  • Painting

Exterior Siding & Painting

Exterior siding replacement and painting that protects the house and resets its curb appeal in one project.

From $2 per sq ft Typical timeline: 1 to 2 weeks
Finished white kitchen remodel with island and pendant lightingFreestanding soaking tub in a renovated spa style bathroomHome addition framing under constructionNewly built wood deck attached to a homeFreshly renovated bedroom with designer finishes

Kitchen Remodel

From $28,000Most requested project of the year

See kitchen remodeling

Reviews

What homeowners say after the crew leaves

  1. “We got a fixed price for the kitchen before a single cabinet came out, and that is exactly what we paid at the end. No change orders, no surprise line items.”

    Danielle R.Homeowner

  2. “One project manager for the whole bathroom remodel meant I was not chasing down four different subcontractors. He called before every delay, not after.”

    Marcus T.Homeowner

  3. “The addition ties into the original roofline so well that neighbors ask which part of the house is new. That was the whole point of paying for a design consultation up front.”

    Priya S.Homeowner

  4. “They found water damage behind our old tub that two other contractors missed on their walkthroughs. Glad it got caught before the new tile went in.”

    James O.Homeowner

  5. “Basement finishing took five weeks, right on the schedule they gave us at the start. The moisture work they did first is the reason it still feels dry a year later.”

    Wanda K.Homeowner

Questions

Answers before your first consultation

Do you offer free estimates?

Yes. Every project starts with a free, in-home consultation and a fixed-price proposal before any work begins.

How long does a typical remodel take?

A bathroom remodel usually takes 2 to 4 weeks, a kitchen remodel 5 to 8 weeks, and a whole-home renovation 3 to 6 months, depending on scope.

Do you handle permits?

Yes. We pull permits and schedule inspections for any project that requires them, including additions and structural work.

Is there a deposit?

Projects require a deposit to schedule materials and crew time, with the balance due at agreed milestones, all spelled out in the fixed-price proposal.

Do you offer a warranty?

Every project carries a 5-year workmanship warranty. Manufacturer warranties on fixtures and appliances are registered on your behalf.

What areas do you serve?

We serve homeowners across the metro area. Use the contact form with your address and we will confirm coverage.

See every question

Ready to start

Get a fixed-price proposal for your renovation

Free in-home consultations, an itemized proposal before any demo starts, and a crew that shows up on the schedule we give you.

  • Licensed, bonded, and insured crews
  • Fixed-price proposals, agreed before demo day
  • In-house crews for every trade, no subcontractor gaps
  • 5-year workmanship warranty on every project

Serving homeowners across the metro area.

Framing crew building a new roof structure

Ready to start your renovation?

Fixed-price proposals, in-house crews, and a project manager who shows up on schedule.

Get a Free Estimate

Keep scrolling for the full directory