Bathroom
Tile & Waterproofing
Shower and floor tile installed over a properly waterproofed substrate, the step most callbacks trace back to.
From $2,600
Typical timeline: 3 to 6 days
- Waterproof membrane installed before any tile goes up
- Slope checked so water runs to the drain, not the curb
- Grout and caulk sealed to manufacturer spec
- Most tile styles and formats available
Most tile failures are a waterproofing problem wearing a tile costume. We install the membrane and check drain slope before a single tile goes up, which is the part of the job that actually prevents leaks.
How it works
From the first sketch to the final walkthrough
Free consultation
Walk us through the project and we will scope it on-site, often within the week.
Fixed-price proposal
A written, itemized proposal before any demo starts, so there are no surprises mid-project.
The build, managed for you
One project manager and an in-house crew handle every trade, with a written schedule and weekly updates.
Walkthrough, not a hand-wave
Every project ends with a room-by-room walkthrough and a 5-year workmanship warranty.
More in Bathroom
Related services
Not sure where to start
Describe the project, we will scope it with you
A short call is usually enough to tell you what it takes, in scope and in budget, before you commit to anything.
- Fixed-price proposals agreed before demo day
- In-house crews for every trade
- 5-year workmanship warranty