Bathroom

Tile & Waterproofing

Shower and floor tile installed over a properly waterproofed substrate, the step most callbacks trace back to.

From $2,600

Typical timeline: 3 to 6 days

  • Waterproof membrane installed before any tile goes up
  • Slope checked so water runs to the drain, not the curb
  • Grout and caulk sealed to manufacturer spec
  • Most tile styles and formats available
Blue subway tile shower with handheld shower head

Most tile failures are a waterproofing problem wearing a tile costume. We install the membrane and check drain slope before a single tile goes up, which is the part of the job that actually prevents leaks.

How it works

From the first sketch to the final walkthrough

01

Free consultation

Walk us through the project and we will scope it on-site, often within the week.

02

Fixed-price proposal

A written, itemized proposal before any demo starts, so there are no surprises mid-project.

03

The build, managed for you

One project manager and an in-house crew handle every trade, with a written schedule and weekly updates.

04

Walkthrough, not a hand-wave

Every project ends with a room-by-room walkthrough and a 5-year workmanship warranty.

Not sure where to start

Describe the project, we will scope it with you

A short call is usually enough to tell you what it takes, in scope and in budget, before you commit to anything.

  • Fixed-price proposals agreed before demo day
  • In-house crews for every trade
  • 5-year workmanship warranty
Contractor reviewing blueprint plans

Ready to start your renovation?

Fixed-price proposals, in-house crews, and a project manager who shows up on schedule.

Get a Free Estimate

Keep scrolling for the full directory